Lokring Flange connections installed on the pipes, saved a whopping 4 days for client

A critical deluge line blocked the lift path of a unit on an offshore platform during maintenance, causing a major setback. Thanks to Lokring Flange connections installed on the pipes, the client saved a whopping 4 days!

Lokring Technology requires no hot work and can be installed with moisture present in the pipe. Contact us to book your first demonstration at +974 4441 9603.