Case Study: Isolate Extensive Leaks and Reinstate Gas Lift Functionality with Retrofitted Multi-Run Straddle System
![Case Study - Isolate Extensive Leaks and Reinstate Gas Lift Functionality](https://petrotec.com.qa/wp-content/uploads/2023/03/Case-Study-Isolate-Extensive-Leaks-and-Reinstate-Gas-Lift-Functionality.jpg)
Do you need a solution to isolate an extensive leaking section in your completion string and reinstate gas lift integrity without performing an expensive workover? We did just that for a major client in Qatar.
Utilising our Anchored Production Straddle (APS) retrofitted with a PTC Go-Lift gas lift valve, we were able to isolate an 85ft section of the completion string and re-introduce gas lift capability without the need for a workover.
Petrotec is a local partner for Interwell in Qatar.
Leave a Reply